Project Thyssen Krupp daproh—Data and prozess harmonisation

November 2012 to March 2013

Branch steel industrie, ThyssenKrupp, Essen

tast: analyzing current process situation in the area of the logistics prozesse (Modules SD, MM, PP, WM, PM and CS). Comparison Report—checking results against Key Group Requirements. Proposal solution which processes shouild be used by which systems an which modules. Decision paper for the CIO

Technical area R/3 ECC 6.0 und many other systems

Homepage

Curriculum vitae

Development

Business Area

Operation area

Technical skill

SAP Know-How

Project Koenig and Bauer –POInt —prozess harmonisation, orgaisation and Information technologie

April 2013—November 2013

Branch Building, Koenig and Bauer, Wuerzburg, Radebeul, Moedling, Lausanne

task: analyzing current process situation in the area of the logistics prozesse (Modules SD, MM, PP, WM, QM and CS). Proposal solution which processes should be used harmonized for all plants including new organization structure

Task: Projectlead PP, Master data and integration of logistics processes

 

Project VW and Audi. Prototypen and pre series building

January 2014—March 2015

Branch automotove, VW and Audi Wolfsburg, Ingolstadt

Task. Analyzing currently situation. Creatiung concept for material movement in for production in pre series and prototyping building.

How to implementate this in SAP Standard MM, PP and WM

Technical area R/3 ECC 6.0 und many other systems

Mai 2014—Septembre 2017 (parttime)

Branch logistics german railway

Task: Check and concept of logistics process with serializing of security embedded items. Technical area R/3 ECC 6.0

Project german railway. serializing

Febrary 2015—April 2016

Branch Chemical and Pharma all locations

Task: Check and concept of logistics process labeling  with software from Atos and Ebsoft. Modules MM, PP, HUM, WM, EH&S. Technical area R/3 ECC 6.0

Project Evonik—Rollout Labeling with Atos and Ebsoft